The company is mainly engaged in small-scale precision and opencast mining, as well as performing minor construction, excavation and blasting work.

THE COMPANY ALSO PERFORMS THE REMOVAL OF STONE AND CONCRETE FOR SENSITIVE SITES USING THE FRAGMENTAL MORTAR METHOD OR BY WEDGING

NOTE !! THE HOUR PRICE OF BLASTING WORK WILL REDUCE THE MORE IT WILL ACCUME IN 8 HOUR CYCLES.

THE PRICE PER KILO OF EXPLOSIVE ALSO DECREASES AS THE QUANTITY TO BE USED INCREASES.

CONTRACT-BASED FIXED INVOICING FOR THE ENTIRE PROJECT IS ALSO POSSIBLE.

EXCAVATION WORK PERFORMED IN JUNE 2021 -10% OF THE TOTAL CONTRACT (contracts to be concluded before June 2021)

All blasting operations charge for at least one kilogram of explosive.

Uusimmat kommentit

08.11 | 15:30

Morjens! Tästä linkistä voit käydä ostamasta itsellesi ao. tykin ohjesäännön: https://www.swat.fi/index.php?route=product/product&product_id=4725
Uskon, että sieltä löytyy apuja?

08.11 | 13:13

Tervehdys
Tykistön syyshuolto on tehty. Lukot on purettu ja puhdistettu. Kokoelmaan kuuluu yksi kiilalukkoinen mysteeri jota ei ole saatu purettua. Miten irtoaa 76K36:n kiilalukko?

27.05 | 08:04

Hei, Voitko laittaa mulle sähköpostia suoraan? tiilikainen@tykkitoni.fi tai soittaa mulle numeroon 020 730 1150?

24.05 | 13:35

Merikarvian saaressa pitäisi noin 6 kpl kiveä räjäyttää, jotta saadaan rakennettua Talas ihan meren rantaan. Kivet ovat halkaisijaltaan alle 2 metriä.

Jaa tämä sivu